Thursday, May 7, 2026 Houston

Good morning, Aldona.

Coaching

Recovery is patient with you.

Readiness
75
Oura
HRV
Oura, ms
Sleep
80% efficiency

Plast Reconstr Surg  ·  April 2026

The radiated breast pocket: rethinking timing in the era of pre-pectoral.

A multi-center cohort suggests early DTI conversion may outperform delayed exchange in irradiated patients, with capsular contracture rates closer to non-irradiated controls when matrix coverage is complete.

What today is actually for.

No Win the Day tasks set yet. Pick one task and tag it Win the Day.

What's gone quiet.

The home and self portfolio.

In progress
4 active
Style the house entry
Garage doors and driveway
Organize medical information
Closet organization
Initiated
5 starting
Organize date nights
Notion & productivity
ProductivityOpen in Notion
Develop optimal journal method
Personal GrowthOpen in Notion
Define goals and lifeplan
ProductivityOpen in Notion
Beauty basket
On hold and idle
7 paused
Hygge house. A&D Echo configuration. Update Aldona-Damon website. Take a dance class. Keto Diet. Continue strict Step 1 on F-Factor. Organize social activities.
NoteThe work workspace (drspiegel) is not yet connected. Tasks shown reflect known active work derived from your conversation history. Connect the drspiegel Notion workspace to OpenClaw to populate this tab from live data.

The clinical and academic plate.

IP  ·  Active
AngioLock provisional patent disclosure
Send to Mick with the two-phase workflow callout. OTT clock starts on his sign-off.
Speaking  ·  13 days out
MTF Scottsdale Symposium prep
Final pass on radiated breast deck. The 122-patient slide is the keystone.
HMH  ·  Negotiation
Contract renewal counter draft
0.5 FTE structure with OptiMe IP language explicitly out of scope.
Manuscript
Capsular contracture study, final review
Infection-not-radiation finding holds across reviewers. Submit by month end.
Manuscript
BREAST-Q COVID-19 outcomes paper
Statistical analysis complete. Discussion section needs tightening.
NoteThe optimasurgery workspace is not yet connected. Venture cards show known status; live ops data populates once OpenClaw has access.
Digital Health
OptiMe.Health
On Track

This Week

  • Onboarding flow v3 in QA, deploy Friday
  • Three Lost Horse leads need re-touch
  • Monthly dev review Thursday 4pm

Open Decisions

  • Pilot partnership channel: provider vs. payer-led
  • IP scope language for HMH contract

Pilot pursuit phase. The product side is healthy, the GTM side needs your attention this month.

Continuous Monitoring
EMBRa
Decision Owed

This Week

  • Beachhead segment decision overdue, 14 days
  • Yoel waiting on framework draft
  • MIT digital fiber prototype awaiting input

Open Decisions

  • Beachhead: surveillance survivors vs. high-risk pre-clinical
  • SPV vs. seed round structure

The decision is the bottleneck. Pick a beachhead, the rest follows.

Biologics IP
BioGraft
Steady

This Week

  • IP review pending counsel availability
  • Quiet week, intentionally

Open Decisions

  • Licensing path vs. SPV vehicle

Holding pattern is the right pattern. Re-engage after MTF Scottsdale.

EMBRa
Send beachhead segment framework to Yoel
Two-page memo: surveillance survivors vs. pre-clinical, with sizing for each.
OptiMe
Re-touch the three Lost Horse leads
First touch was March, before pilot architecture clarified. New deck warrants re-engagement.
Optima
Start-up entity structure decision
SPV vs. C-corp formation. Tax implications differ for IP licensing.
Weight
131 lbs
−1.8 in 30d
Body Fat
23 %
−0.4 pts
Muscle Mass
42.1 kg
+0.3 kg
Hydration
55 %
stable
Recovery, 30 days
71%
Apr 7+9 pts trendToday
HRV, 30 days
62ms
Apr 7+6 ms trendToday
Thu
Fri
Sat
Sun
Mon
Tue
Wed

Average 7h 32m, efficiency 84%. The Friday dip was the long travel day. Pattern is otherwise quietly stable, body adjusting to local time.

Volume
12.4k
lbs total
Strength
68
score
Reps
412
total

26 days until kick-off.

Baseline labs and protocol scaffolding due before June 1. Mycotoxin panel ordered. Initial macros and training split to be set over Memorial Day weekend.

32 areas across 7 frameworks. Each one is a hub for related projects, goals, routines, books, and notes. Tap a hub to see what's moving inside it.
7frameworks
Career & FinancesCareer
5 hubs
Work
3 active13d ago
Two of three projects have no next action defined.
Ventures
3 ventures2d ago
EMBRa beachhead is the bottleneck. Decide it.
Ventures Misc
7 items21d ago
Likely needs review during weekly.
Finances
12 items8d ago
Q2 review on track for Sunday.
Ideas
4 brewing3d ago
Two ideas relate to active ventures.
Health & LifestyleBody
8 hubs
Health + Wellness
June protocol1d ago
Baseline labs ordered, on schedule.
Fitness
3 routines2d ago
Tonal at 3 of 4 this week, one short.
Food + Diet
2 active5d ago
Pre-protocol, holding steady.
Yoga
11d ago
Routine has lapsed past its weekly cadence.
Mindfulness
14d ago
Two weeks. Worth picking up after MTF.
Beauty
Chanel order4d ago
Paris pickup logged in Wardrobe.
Travel
In Francenow
Provence trip live. TGV booking pending.
Shopping + Style
9d ago
Wardrobe DB updated this week.
Physical SpaceHome
7 hubs
Telluride
Land DD8d ago
House + Home
4 projects2d ago
Punta Mita
22d ago
Cottage
31d ago
Vacation Homes
Index
Car
Mercedes17d ago
Personal DevelopmentMind
6 hubs
Learning
EMBA wrap1d ago
Personal Growth
5d ago
Notion
Dashboardnow
Productivity
2 routines3d ago
Spirituality
19d ago
Organization
2d ago
RelationshipsSocial
2 hubs
Family
10 activenow
Relationships
7d ago
Hobbies & LeisureMind
3 hubs
Hobbies
15d ago
Leisure
9d ago
Fun + Leisure
23d ago
Societal RolesSocial
1 hub
Social
12d ago
Physical Space  ·  Hub Detail

France Dream Home

A four-year search, recently entering active acquisition mode. Provence-focused, mas or bastide preferred, 3-5 million euros, Alpilles or Luberon.

Active Projects
4
Goals Aligned
2
Days Since Touch
3
Reading Queue
7

Active Projects

  • SCI entity formation, IRS check-the-box election
  • Property search: Alpilles + Luberon mas
  • IFI exposure modeling for ownership structure
  • Furnished rental regime analysis (LMNP vs LMP)

Next Actions

  • Email notary for SCI intake follow-up@computer10 min
  • Confirm Saturday viewing with Joucas broker@phone5 min
  • Review Properstar weekend digest@anywhere15 min
  • Drive to Gordes for Sunday viewings@france3 hr

Waiting For

  • Notary intake responsesince Apr 27
  • Damon's review of IFI memosince May 3
  • Tax counsel quote on SCI formationsince May 4

Stalled / Reading

  • French property law overview, Frédéric Douet
  • Provence: Bastides & Mas, in progress
  • SeLoger saved searches: 12 properties
  • Le Figaro Immobilier weekly digest
InsightThe hub has had four active projects for six weeks but no offers submitted. Notary intake is the bottleneck blocking SCI formation, and the response is nine days overdue. Recent activity is concentrated on research, not action. Suggestion: send the notary follow-up today (10 min, @computer), then frame the next two property visits around offer-readiness rather than viewing.
The Dashboard Demo Mode